ENFR
Get it — €19
New · second tool

A Gantt schedule
you grab with the mouse

Drag the edge of a task: its duration changes. Slide it: its date changes. Either way, everything that depends on it re-plans itself — skipping weekends, public holidays and leave. All inside Excel, with no subscription and no server.

Try the demo See the price
✅ Lifetime licence, no subscription 🔓 Open VBA source and editable 💳 Refunded for 30 days

This is not a picture: it is the tool

The demonstration below replays exactly how the add-in behaves. Same ribbon, same gestures, same date engine. Play with it freely.

Gantt_Planning.xlsm — Microsoft Excel Interactive demonstration
File
Home
GANTT
Insert
Data
View
Tasks
Quick edit
Dependencies
Hierarchy
View
Analysis
History and tracking
Brochure site Office refit Q3 reporting Weekend Holiday Leave

Tip: hold Ctrl to select two non-adjacent rows, then click Link / Chain.

The schedule you are already holding in Excel

You know the three-column table that gets recoloured by hand every Monday. Here is what changes when the bars become real objects.

⛔ The hand-made Gantt

  • Cells are recoloured one by one
  • One task slips by a day, and everything downstream has to be redone
  • Weekends and leave are counted in your head
  • Nobody knows which task is really pushing the end date
  • A shifting error shows up three weeks later
→

✅ With the Gantt add-in

  • You grab the block and stretch it: the duration follows
  • Everything downstream re-plans in a fraction of a second
  • Weekends, public holidays and leave are skipped automatically
  • The critical path appears in one click
  • Ctrl+Z undoes any gesture

What is in the box

A macro-enabled Excel workbook, a dedicated ribbon, and nothing else to install.

🖱️

Direct manipulation

Right edge = duration. Left edge = start date, end date frozen. Body = whole shift. A summary bar moves its entire package in a single gesture.

🔗

Dependencies that follow

Links finish→start, start→start, finish→finish, with lag. Select several rows and chain them in one click. Circular dependencies are refused.

📅

Real working days

Configurable working days of the week, French public holidays calculated (Easter included), and your leave excluded from the schedule.

⚠️

Critical path and float

Every task shows its float in days. Zero float = any delay on it pushes the end of the project. One button, and the critical chain appears.

🧱

Work packages and subtasks

Indent, outdent, move up, move down. The numbering 1.2.3 recalculates itself, and the links never break.

↩️

Unlimited undo

An undo stack of the schedule's own, wired to Ctrl+Z. No gesture is final.

Three gestures, three videos

Under thirty seconds each. Sound is not needed.

Lengthen a task

The right edge is dragged out by two days: the four following tasks move back by the same amount, without touching the keyboard.

Chain a package

Three rows selected, one click on “Link / Chain”: they line up end to end, weekend skipped.

See what matters

Critical path shown: the tasks with no float appear, and you finally know which one is holding the end date.

Would you rather try it yourself? The demonstration is just above.

One price, once

No subscription, no account to create, no data going anywhere else.

Lifetime licence

Gantt Excel

The complete workbook, ready to use.

39€19€ incl. VAT 🚀 Launch offer −50%

Secure payment · Refunded for 30 days · Invoice provided
Windows + Excel 2016 or newer

Would you rather build it yourself?

Our guide explains how to draw a Gantt chart in Excel with two formulas and conditional formatting: working days, French public holidays, a today line and overruns in red. Every formula in it has been tested.

Read the guide “Making a Gantt chart in Excel” →
============================= -->

Frequently asked questions

Do I have to install anything?

No. It is an Excel workbook: you open it, you enable macros, and the GANTT tab appears. No server, no database, no account.

Does it work on a Mac or on Excel online?

No, and we would rather say so plainly: the custom ribbon and the handling of shapes require Excel on Windows (2016 or newer). On a Mac or in the browser the file opens, but the gestures do not work.

Does it slow Excel down?

Picking up moved blocks relies on one check per second, active only on the schedule sheet. Measured on 200 tasks: 0.09% of one core. And if you would rather no check ran at all, an “Auto-track” switch turns it off: a button then validates your moves whenever you decide.

How many tasks can I manage?

200 rows per schedule, organised into work packages and subtasks. Beyond that, better to split across several workbooks — it is more readable too.

Can I modify the code?

Yes. The VBA is open and commented throughout. You can add your own columns, change the colours, wire in your own macros.

And if it does not suit me?

Refunded within 30 days, no justification needed. Simply write to contact@outilsexcel.fr.