A Gantt schedule
you grab with the mouse

Drag the edge of a task: its duration changes. Slide it: its date changes. Either way, everything that depends on it re-plans itself — skipping weekends, public holidays and leave. Overloaded resources are levelled in one click, and every task lands in the Outlook calendar of its owner, with no duplicates. All inside Excel, with no subscription and no server.

▶ Try the demo
✅ Lifetime licence, no subscription 🔓 Open VBA source and editable 💳 Refunded for 30 days

This is not a picture: it is the tool

The demonstration below replays exactly how the add-in behaves. Same ribbon, same gestures, same date engine. Play with it freely.

Gantt_Planning.xlsm — Microsoft Excel Interactive demonstration
File
Home
GANTT
Insert
Data
View
Tasks
Quick edit
Dependencies
Hierarchy
View
Analysis
Outlook
History and tracking
Brochure site Office refit Q3 reporting Weekend Holiday Leave Overload

Tip: hold Ctrl to select two non-adjacent rows, then click Link / Chain.

The schedule you are already holding in Excel

You know the three-column table that gets recoloured by hand every Monday. Here is what changes when the bars become real objects.

⛔ The hand-made Gantt

  • Cells are recoloured one by one
  • One task slips by a day, and everything downstream has to be redone
  • Weekends and leave are counted in your head
  • Nobody knows which task is really pushing the end date
  • The same person ends up on three tasks on the same day
  • Everyone copies their dates into their calendar… or doesn't
  • A shifting error shows up three weeks later
→

✅ With the Gantt add-in

  • You grab the block and stretch it: the duration follows
  • Everything downstream re-plans in a fraction of a second
  • Weekends, public holidays and leave are skipped automatically
  • The critical path appears in one click
  • The overloads are outlined in orange and levelled in one click
  • Every task lands in the Outlook calendar of its owner
  • Ctrl+Z undoes any gesture

A schedule for the whole team

A schedule is useless if it stays in the workbook, or if it asks someone to be in two places at once. Two ribbon buttons solve both problems.

📅 Outlook sync

Every task in its owner's calendar

Sync Outlook sends the schedule to the Outlook calendar: one all-day event per task, filed under a category named after the project.

  • No duplicates. Every task leaves an identifier in its appointment: at the next sync, the existing appointment is found and updated in place.
  • Only what moved goes out again. A task unchanged since the last sync is skipped.
  • Invitations to team members. Enter a resource's email address: they receive an Outlook invitation, then an update at every shift.
  • Individual schedule or .ics file. Send only one person's tasks, or export a calendar file for Google Calendar or Apple Calendar.

Direct sync requires classic Outlook for Windows. Without it, the .ics export is still available.

OCalendar — Léa Work week
✓ Sync complete Created: 2Updated: 1 Unchanged: 12Duplicates: 0
Mon16
Tue17
Wed18
Thu19
Fri20
Mockups & sign-off updatedBrochure site
Data extraction newQ3 reporting
Meeting 10:00
✉ Invitation sent to Léa: her calendar will follow every shift in the schedule.
👥 Resource levelling

Nobody on two tasks at once

In the Resourcessheet, a column states how many tasks each person or team can run in parallel. As soon as a resource exceeds its capacity, its bars are outlined in orange and its name turns orange.

  • One capacity per resource. 1 for a single person, 2 or 3 for a small team, blank for a supplier or a pending approval.
  • Level resources only shifts overloaded tasks, while respecting links, priorities and locked tasks.
  • Nothing moves without you. Levelling runs on a click, never on its own, and Ctrl+Z undoes it.
Try it: in the demo, Léa and Karim are overloaded ↑
Resource: LéaMax concurrent: 1
Before ⚠ 2 tasks on Wednesday
Mockups & sign-off
Extraction
After “Level resources” ✓ one task at a time
Mockups & sign-off
Extraction
ResourceMax concurrentEffect
Léa1one task at a time
Fitting crew2two tasks in parallel
The supplier—unlimited, never delayed

What is in the box

A macro-enabled Excel workbook, a dedicated ribbon, and nothing else to install.

📅

Outlook sync new

One appointment per task, updated in place at every sync: never a duplicate. Invitations to team members and .ics export.

👥

Resource levelling new

One capacity per person or per team. overloads are flagged, and one click shifts just what is needed.

🖱️

Direct manipulation

Right edge = duration. Left edge = start date, end date frozen. Body = whole shift. A summary bar moves its entire package in a single gesture.

🔗

Dependencies that follow

Links finish→start, start→start, finish→finish, with lag. Select several rows and chain them in one click. Circular dependencies are refused.

📅

Real working days

Configurable working days of the week, French public holidays calculated (Easter included), and your leave excluded from the schedule.

⚠️

Critical path and float

Every task shows its float in days. Zero float = any delay on it pushes the end of the project. One button, and the critical chain appears.

🧱

Work packages and subtasks

Indent, outdent, move up, move down. The numbering 1.2.3 recalculates itself, and the links never break.

↩️

Unlimited undo

An undo stack of the schedule's own, wired to Ctrl+Z. No gesture is final.

Three gestures, three videos

Under thirty seconds each. Sound is not needed.

Lengthen a task

The right edge is dragged out by two days: the four following tasks move back by the same amount, without touching the keyboard.

Chain a package

Three rows selected, one click on “Link / Chain”: they line up end to end, weekend skipped.

See what matters

Critical path shown: the tasks with no float appear, and you finally know which one is holding the end date.

Would you rather try it yourself? The demonstration is just above.

One price, once

No subscription, no account to create, no data going anywhere else.

Lifetime licence

Gantt Planner

The complete workbook, ready to use.

€39€19 netSale price −50%

Secure payment · Refunded for 30 days · Invoice provided
Windows + Excel 2016 or newer

Would you rather build it yourself?

Our guide explains how to draw a Gantt chart in Excel with two formulas and conditional formatting: working days, French public holidays, a today line and overruns in red. Every formula in it has been tested.

Read the guide “Making a Gantt chart in Excel” →

Frequently asked questions

Do I have to install anything?

No. It is an Excel workbook: you open it, you enable macros, and the GANTT tab appears. No server, no database, no account.

Does it work on a Mac or on Excel online?

Not directly, and we would rather say so before you buy: the schedule needs Excel for Windows (2016, 2019, 2021, 2024 or Microsoft 365). Two precise reasons: the GANTT tab added to the ribbon relies on customUItechnology, which Excel for Mac cannot display, and synchronisation goes through classic Outlook for Windows. In Excel for the web, the file opens and can be read, but no macro runs.

Workarounds that do work: Windows in a virtual machine (Parallels Desktop, VMware Fusion, UTM — including on Apple Silicon Macs), a Windows PC at the office, or a remote Windows desktop. And the schedule stays an ordinary Excel workbook: it can be read on a Mac, and the iCalendar (.ics) export feeds Apple Calendar as well as Google Calendar.

Not sure about your setup? Write to contact@outilsexcel.fr before ordering. Afterwards, the refund window runs for 30 days, with no justification needed.

Does it slow Excel down?

Picking up moved blocks relies on one check per second, active only on the schedule sheet. Measured on 200 tasks: 0.09% of one core. And if you would rather no check ran at all, an “Auto-track” switch turns it off: a button then validates your moves whenever you decide.

Does the Outlook sync work with every calendar?

Direct sync goes through classic Outlook for Windows, installed and set up on your computer. Your colleagues need neither Excel nor the add-in: they simply receive Outlook invitations. For Google Calendar, Apple Calendar or the new Outlook, the ribbon exports an .ics export.

How does levelling choose which tasks to shift?

It places tasks in the order they can start, highest priority first, in the first slot where their resource has room. Links are respected, locked tasks never move, and a task with no owner or assigned to an unlimited resource is never delayed.

How many tasks can I manage?

200 rows per schedule, organised into work packages and subtasks. Beyond that, better to split across several workbooks — it is more readable too.

Can I modify the code?

Yes. The VBA is open and commented throughout. You can add your own columns, change the colours, wire in your own macros.

Are the 2027 public holidays and the 253 working days of 2027 already built in?

Yes: the 11 French public holidays of 2027 (including Easter Monday on 29 March, Ascension Day on 6 May and Whit Monday on 17 May) are already set up so that non-working days are skipped automatically.

And if it does not suit me?

Refunded within 30 days, no justification needed. Simply write to contact@outilsexcel.fr.