Drag the edge of a task: its duration changes. Slide it: its date changes. Either way, everything that depends on it re-plans itself — skipping weekends, public holidays and leave. Overloaded resources are levelled in one click, and every task lands in the Outlook calendar of its owner, with no duplicates. All inside Excel, with no subscription and no server.
The demonstration below replays exactly how the add-in behaves. Same ribbon, same gestures, same date engine. Play with it freely.
Tip: hold Ctrl to select two non-adjacent rows, then click Link / Chain.
You know the three-column table that gets recoloured by hand every Monday. Here is what changes when the bars become real objects.
A schedule is useless if it stays in the workbook, or if it asks someone to be in two places at once. Two ribbon buttons solve both problems.
Sync Outlook sends the schedule to the Outlook calendar: one all-day event per task, filed under a category named after the project.
Direct sync requires classic Outlook for Windows. Without it, the .ics export is still available.
In the Resourcessheet, a column states how many tasks each person or team can run in parallel. As soon as a resource exceeds its capacity, its bars are outlined in orange and its name turns orange.
| Resource | Max concurrent | Effect |
|---|---|---|
| Léa | 1 | one task at a time |
| Fitting crew | 2 | two tasks in parallel |
| The supplier | — | unlimited, never delayed |
A macro-enabled Excel workbook, a dedicated ribbon, and nothing else to install.
One appointment per task, updated in place at every sync: never a duplicate. Invitations to team members and .ics export.
One capacity per person or per team. overloads are flagged, and one click shifts just what is needed.
Right edge = duration. Left edge = start date, end date frozen. Body = whole shift. A summary bar moves its entire package in a single gesture.
Links finish→start, start→start, finish→finish, with lag. Select several rows and chain them in one click. Circular dependencies are refused.
Configurable working days of the week, French public holidays calculated (Easter included), and your leave excluded from the schedule.
Every task shows its float in days. Zero float = any delay on it pushes the end of the project. One button, and the critical chain appears.
Indent, outdent, move up, move down. The numbering 1.2.3 recalculates itself, and the links never break.
An undo stack of the schedule's own, wired to Ctrl+Z. No gesture is final.
Under thirty seconds each. Sound is not needed.
The right edge is dragged out by two days: the four following tasks move back by the same amount, without touching the keyboard.
Three rows selected, one click on “Link / Chain”: they line up end to end, weekend skipped.
Critical path shown: the tasks with no float appear, and you finally know which one is holding the end date.
Would you rather try it yourself? The demonstration is just above.
No subscription, no account to create, no data going anywhere else.
The complete workbook, ready to use.
Secure payment · Refunded for 30 days · Invoice provided
Windows + Excel 2016 or newer
Our guide explains how to draw a Gantt chart in Excel with two formulas and conditional formatting: working days, French public holidays, a today line and overruns in red. Every formula in it has been tested.
Read the guide “Making a Gantt chart in Excel” →No. It is an Excel workbook: you open it, you enable macros, and the GANTT tab appears. No server, no database, no account.
Not directly, and we would rather say so before you buy: the schedule needs Excel for Windows (2016, 2019, 2021, 2024 or Microsoft 365). Two precise reasons: the GANTT tab added to the ribbon relies on customUItechnology, which Excel for Mac cannot display, and synchronisation goes through classic Outlook for Windows. In Excel for the web, the file opens and can be read, but no macro runs.
Workarounds that do work: Windows in a virtual machine (Parallels Desktop, VMware Fusion, UTM — including on Apple Silicon Macs), a Windows PC at the office, or a remote Windows desktop. And the schedule stays an ordinary Excel workbook: it can be read on a Mac, and the iCalendar (.ics) export feeds Apple Calendar as well as Google Calendar.
Not sure about your setup? Write to contact@outilsexcel.fr before ordering. Afterwards, the refund window runs for 30 days, with no justification needed.
Picking up moved blocks relies on one check per second, active only on the schedule sheet. Measured on 200 tasks: 0.09% of one core. And if you would rather no check ran at all, an “Auto-track” switch turns it off: a button then validates your moves whenever you decide.
Direct sync goes through classic Outlook for Windows, installed and set up on your computer. Your colleagues need neither Excel nor the add-in: they simply receive Outlook invitations. For Google Calendar, Apple Calendar or the new Outlook, the ribbon exports an .ics export.
It places tasks in the order they can start, highest priority first, in the first slot where their resource has room. Links are respected, locked tasks never move, and a task with no owner or assigned to an unlimited resource is never delayed.
200 rows per schedule, organised into work packages and subtasks. Beyond that, better to split across several workbooks — it is more readable too.
Yes. The VBA is open and commented throughout. You can add your own columns, change the colours, wire in your own macros.
Yes: the 11 French public holidays of 2027 (including Easter Monday on 29 March, Ascension Day on 6 May and Whit Monday on 17 May) are already set up so that non-working days are skipped automatically.
Refunded within 30 days, no justification needed. Simply write to contact@outilsexcel.fr.